Specifiers’ journal
12 Basin Specification Terms for Project Buyers
Use this glossary when comparing fixtures, briefing an installer or requesting a project quotation.
Fixture and installation terms
- Floor-standing pedestal basin. A basin supported by a pedestal that reaches the floor. Check the overall height, base footprint and the space needed around the fixture.
- Countertop vessel basin. A basin that sits on a counter. Check the basin height together with the counter height and the faucet outlet position.
- Wall-hung basin. A basin attached to a wall. Verify the mounting and support requirements for the selected model.
- Rough-in. The position of the waste and water connections before the fixture is installed. Compare the model drawing with the site measurements.
- Overflow. An opening on some basins that directs water toward the waste. Confirm whether the model has one and which type of drain fitting it requires.
- Drain opening. The opening where the waste fitting attaches. Check the opening dimensions and whether the relevant parts are included.
- Faucet placement. The position of the faucet on the basin, counter or wall. Check reach, outlet height and clearance for the controls.
- Finish. The surface appearance of the fixture. Use the accepted color or finish reference when confirming the order.
Quotation terms
- EXW (Ex Works). A trade term tied to a named pickup location. Ask which freight, insurance and destination charges need to be arranged separately.
- DDP (Delivered Duty Paid). A delivery term used with a named destination. Ask whether it is available and what the quotation covers for the destination.
- Lead time. The time allowed before a specified milestone. Ask whether the figure means readiness for dispatch, transit time or estimated arrival.
- MOQ. The minimum order quantity. Check whether it applies per model, per finish or to the combined order.
Use the specification checklist to prepare your details before you request a project quotation.