Specifiers’ journal

12 Basin Specification Terms for Project Buyers

Use this glossary when comparing fixtures, briefing an installer or requesting a project quotation.

Fixture and installation terms

  1. Floor-standing pedestal basin. A basin supported by a pedestal that reaches the floor. Check the overall height, base footprint and the space needed around the fixture.
  2. Countertop vessel basin. A basin that sits on a counter. Check the basin height together with the counter height and the faucet outlet position.
  3. Wall-hung basin. A basin attached to a wall. Verify the mounting and support requirements for the selected model.
  4. Rough-in. The position of the waste and water connections before the fixture is installed. Compare the model drawing with the site measurements.
  5. Overflow. An opening on some basins that directs water toward the waste. Confirm whether the model has one and which type of drain fitting it requires.
  6. Drain opening. The opening where the waste fitting attaches. Check the opening dimensions and whether the relevant parts are included.
  7. Faucet placement. The position of the faucet on the basin, counter or wall. Check reach, outlet height and clearance for the controls.
  8. Finish. The surface appearance of the fixture. Use the accepted color or finish reference when confirming the order.

Quotation terms

  1. EXW (Ex Works). A trade term tied to a named pickup location. Ask which freight, insurance and destination charges need to be arranged separately.
  2. DDP (Delivered Duty Paid). A delivery term used with a named destination. Ask whether it is available and what the quotation covers for the destination.
  3. Lead time. The time allowed before a specified milestone. Ask whether the figure means readiness for dispatch, transit time or estimated arrival.
  4. MOQ. The minimum order quantity. Check whether it applies per model, per finish or to the combined order.

Use the specification checklist to prepare your details before you request a project quotation.